![]() |
January: Rebar and Concrete |
![]() |
The Snake Room:
|
Rebar is set along the floor above the sand |
Myseterious holes have been sealed |
Edge of covered hole |
|
Cement will be poured over the sand |
Rebar will strengthen the concrete |
|
|
|
![]() |
![]() |
![]() |
![]() |
![]() |
The Frog Room:
|
Rebar in the Frog Room |
Covering the troughs around the pipes |
|
|
Barriers protecting pipes from cement |
![]() |