November: Floor Preparation |
![]() |
The Frog Room:
|
Old concrete floor reduced to rubble ... |
Old corner column supports
|
Original brick foundation |
|
Digging trench around the Frog Room |
Old condensation return pipes ... |
around the room |
|
View of Frog Room |
|
Valves (to remain) |
The Snake Room: Removal of concrete floor and off-loading it into dump truck.
|
Concrete pre-cut into manageable slabs |
Jesus pries off the concrete floor |
|
|
|
|
|
![]() |
![]() |
![]() |
|
|
Filling up the truck |
First load estimated at over 8,000 lbs. |
![]() |
![]() |
![]() |
|
Filling in the mysterious holes |
![]() |